Mounds Theater Memorabilia
Building Materials 
Last Update: March 6, 2003
 
This National Recovery Act symbol was stamped on a piece of recently removed air conditioning duct sheet metal.  That would date the metal to the period of 1933-1935.  It was previously believed that the air conditioning system was installed between 1930 and 1933.
 
These are a few other markings found on the air conditioning sheet metal.
 
These two bricks probably date back to the construction of the theater in 1922.